Pet Carrier FactoryQUANZHOU JUNYUAN BAGS

Reply within one working day

Contact

Send a brief, a reference sample or a target price. We reply with a costed tech pack.

Send us quantities, target price and reference images. You will receive a costed tech pack and sampling quotation within 2 working days. Standard terms are MOQ 500 pieces per colourway, samples in 6-10 working days, bulk production in 35-50 days, AQL 2.5 inspection and T/T 30/70 FOB Xiamen.

Direct contacts

What to include in your enquiry

  1. Product family - dog backpack carrier, cat carrier, accessory or a combination.
  2. Target dimensions and the weight band of the animal it must carry.
  3. Quantity per colourway and required delivery window.
  4. Destination market, so we can quote against the right compliance set.
  5. Packaging requirement - bulk packed, retail box, header card, or FBA prepped.
  6. Reference images or a physical sample if you already have one.

Commercial terms

ItemStandardNote
MOQ500 pieces per colourwaySizes may be mixed within one style
Sampling6-10 working daysAfter tech pack confirmation
Sample costQuoted per styleCredited against bulk orders above MOQ
Bulk production35-50 daysAfter sample approval
InspectionAQL 2.5Third-party inspection accepted
PaymentT/T 30/70Deposit before production, balance before shipment
ShipmentFOB XiamenDDP and EXW available on request
Quote turnaroundWithin 2 working daysWith full cost breakdown
Response hoursGMT+8, Mon-SatUsually replied within one business day

What happens after you write in

Day 1-2 - We acknowledge the enquiry and ask for any missing details. Day 2-3 - You receive a costed tech pack with named materials, hardware models and a breakdown showing which line items move the price. Day 3-13 - on receipt of the sampling fee, the prototype is built and shipped. After approval - production is booked for the agreed window, with inline checks and a pre-shipment inspection at AQL 2.5 before loading.

Copy-and-paste enquiry template

The fastest enquiry includes seven lines. Copy the block below into an email and fill it in:

Product: dog backpack carrier / cat carrier / accessory
Quantity: total pieces and split per colourway or size
Target dimensions: length x width x height, and animal weight to be carried
Destination market: EU / US / UK / other
Packaging: bulk polybag / printed box / header card / FBA prep
Target price: FOB per unit, or leave blank for our costing
Timeline: required delivery month

Documents that ship with every order

Each shipment travels with a commercial invoice and packing list, a country-of-origin declaration, the inspection report at the agreed AQL level, and the test reports for the specific dye lot used. Buyers selling into regulated markets also receive the applicable restricted-substance statement and, where required, children's product tracking label artwork. We keep one retained sample per style per production run for twelve months.

Sampling and revisions

First prototypes are built from the approved tech pack. Revisions focus on fit, structure, branding placement and labelling, and normally take 3-5 working days per round. Sample costs are credited against bulk orders above MOQ, and we keep one approved reference sample per style for production comparison.

Two worked timelines

Retailer seasonal programme. Enquiry in March, tech pack and costing by mid-March, two sampling rounds across April, approval in early May, bulk production through June and July, inspection and loading in August for a September shelf date.

Marketplace relaunch. Enquiry in month one, single sample round in month two using standard materials already in stock, approval immediately after, a 500-piece first run landing roughly 45-55 days after enquiry, followed by a reorder decision based on sell-through.

RFQ Field Checklist: Twelve Items Before a Price Is Real

A quotation is only as accurate as the enquiry behind it. Two buyers can ask for the same carrier and receive prices far apart, because one supplied a tech pack and the other supplied a photograph. The twelve fields below are the minimum our production team needs before a number can be defended internally. Anything missing becomes a stated assumption in the quote, and assumptions are what change later.

#FieldWhy it moves the quoted price
1Target FOB price bandEngineered to a cost or costed after design
2Quantity per colourway and totalSet-up amortisation against the 500-piece floor
3Number of colourwaysMaterial purchase lots and line changeovers
4Dimensioned drawing with tolerancesPattern making, marker yield and fit expectations
5Fabric specification and gradeLargest unit cost driver; sets test scope under ISO 105, AATCC 8 and AATCC 61
6Hardware specification and finishTooling planning range and ASTM test scope
7Structure status: existing mould or new toolingRemoves or adds tooling cost and build time
8Branding method and placementPlate, embroidery or label programme
9Packaging specification and barcodePacking method, carton marking and GS1 retail identifiers
10Destination market and compliance setCPSIA, Proposition 65, REACH, EN 71 and OEKO-TEX test scope
11Cabin or airline claimIATA Live Animals Regulations checks on ventilation and structure
12Required delivery windowMeasured against 6-10 sampling, 3-5 per revision and 35-50 days bulk

Two of the twelve deserve a sentence each. The target price band is the most useful field a buyer can supply, because it lets the structure be engineered to a cost instead of costed after it is designed. The delivery window is the field most often omitted, and its omission is the reason a programme that looked comfortable on paper arrives late: bulk production is 35-50 days after approval, and AQL 2.5 inspection under ISO 2859-1 plus FOB Xiamen handover sit on top of that. Payment defaults to T/T 30/70.

Revision Economics: Cost Per Round and the Restart Rule

Revision rounds are not free and they are not infinite. Each round consumes pattern time, material, sample-room capacity and 3-5 working days of calendar, and the cost is real even when the round is nominally included. As a planning range, a first development sample for a pet carrier sits at roughly USD 60-180 per sample depending on structure complexity, with later rounds below that where only a panel, a strap or a placement changes. Courier cost sits on the account of the buyer. These are planning ranges; the confirmed figure follows the released specification, so ask for it in writing before the round is instructed.

Whether the sample fee is deductible is a commercial choice, and the common arrangement is that the first sample fee is credited against the first production order once that order is placed under T/T 30/70. Deduction is normally capped at one round per style, because a buyer who runs six rounds against a creditable fee is effectively being paid to iterate. Ask for the deduction rule in writing, including which round it applies to, whether it survives a change of colourway and what happens if the programme is cancelled after sampling.

The harder question is when to stop. A round that changes trim, shade or placement is normal and should be expected. A third round that is still resolving fit, panel tension or closure geometry usually means the specification is wrong rather than the sample, and the right move is to freeze the pattern, reopen the tech pack and re-cost the structure instead of ordering a fourth sample. Every round also pushes the planned bulk window: 6-10 working days for the first sample, 3-5 working days per revision, then 35-50 days of bulk production before AQL 2.5 pre-shipment inspection under ISO 2859-1 and FOB Xiamen handover. If a round puts the launch date at risk, say so at the time the round is requested, because a frozen slot is far easier to defend than a rebooked one.

Send your brief today MOQ 500 pieces per colourway, samples in 6-10 working days, bulk production in 35-50 days under AQL 2.5 inspection.

Request a quote Ask for samples